ElectricalBossPro Blog — Electrical Contractor Software

Moving an Electrical Contractor Off Paper Work Orders Without Losing a Week

The fear with any switch is that it eats a week you cannot spare. The phones keep ringing, the vans keep rolling and nobody has time to learn a new system. The good news is that moving off paper does not need a shutdown. It needs an order of operations and a short overlap.

Decide That Paper Is Going Away

The reasons to switch are in Electrical Contractor Software vs. Spreadsheets and Paper: Where the Old System Breaks. This article is about how.

The single biggest mistake is running both systems forever. If the work order pad stays in the van “just in case,” it will still be in use six months from now. Pick a date, tell the crew, and plan for a short overlap before it, not an endless one after it.

Step One: Get Your Customers In

Start with the list you already have. Most shops have a customer spreadsheet, an export from an old invoicing tool or a contact list that can be saved as a file. Clean it up enough that each row has a name, an address, a phone and an email, then bring it in with CSV import.

In ElectricalBossPro, imported addresses are placed on the map automatically, so the Waiting List and dispatch board work right away. One client can have many addresses, which matters for landlords and property managers. The details are in CSV Import: Bringing Your Electrical Customer List Into New Software.

Do not wait to fill in every panel and generator before you go live. Equipment records fill in naturally as techs visit each house, because changes made on a job flow back to the house.

Step Two: Enter What You Sell

Next, enter your service list: service call, troubleshooting, outlets, GFCI replacement, breakers, ceiling fans, light fixtures, recessed lighting, dedicated circuits, smoke detectors, surge protectors, EV charger installs, panel upgrades, generator installs, and whatever else is on your price sheet. Use your own prices, such as a $99 service call or a $165 GFCI replacement.

Add your recurring plans with their minimum days between visits: a yearly safety inspection at 365 days, yearly generator maintenance at 365 days, and any commercial relamping every 14 or 30 days. If you already have customers on yearly plans, set them up now so their next visits come due on the map.

Step Three: Set Up Techs and Vans

Add each employee with a personal PIN and a van assignment. Show each tech how to open the app in the phone browser and install it to the home screen. No app store, no special phones. Have them sign in with the company login and their PIN while you are standing there.

Walk one tech through a fake job: open the card, tap navigation, read the equipment, tap Start, take a photo, tap Complete. It takes a few minutes. Most electricians are already comfortable with their phones, and the screen has very few buttons.

Show them the safety inspection checklist on a practice job too, if you sell yearly inspections. The items are fixed, so the tech taps through them rather than writing from memory, then adds readings, a condition and recommendations. Showing it once on a quiet morning beats explaining it in a customer's basement. Show the time clock while you are there, so hours are recorded from the first real day.

Step Four: A Short Overlap

Pick two or three days to run real calls through the software while keeping your old paper as a backup. The office books every new call in the software, routes the vans on the dispatch board, and techs work from their phones. If something goes wrong, the paper is there.

During the overlap, watch for gaps. A service you forgot to enter. A customer the import missed. A tech who is not sure where the inspection checklist is. Fix each one as it comes up. By day three, you may find nobody is touching the paper at all.

Step Five: Pull the Pads

On the date you picked, take the work order pads out of the vans. From here on, a job that is not in the software did not happen. That sounds strict, but it is what makes the system trustworthy: when everything is in one place, anyone can answer a customer's question.

Keep the old paper files in a box for reference. When a past customer calls, look up the old work order once and add what matters to their house record, such as the panel and generator. Over a season, the important history moves over without a big data-entry project.

The first week after the switch is covered day by day in The First Week on Electrical Contractor Software, Day by Day. For the whole system the crew is moving onto, see the electrical contractor software page.

Switch Without Stopping the Phones

Import your customers, enter your services and run real calls in ElectricalBossPro during a 14-day free trial.

Start Free Trial
No credit card required  ·  14-day free trial  ·  from $59/mo after
Keywords: electrician paper work orders, switch to electrical contractor software, electrical company go paperless, electrician software switchover, electrical work order software